Energy Automation and SCADA Systems

The purpose of installation of SCADA systems is to transfer the signals and measurement values from  energy distribution system to a Control Center and to carry out the command and control of the system from Control Center to an interface (PLC, RTU). In this way, saving in operation time, reduce in malfunction time and  increasing the reliability of the system, it is possible to perform retrospective analysis of faults and measurement values.

TS Energy creates special solutions for your facility with the related IEC standards it follows. With its knowledge from the past and experience in projects, TS Energy offer pre-design, engineering, software and commissioning services for the optimal implementation of your SCADA investments which is suitable for your facility.